Septic System Installation
New Septic System Installation in Spartanburg
A new septic system is a full onsite wastewater treatment build, not just a buried tank. Sisteroutsiderpoetry designs and installs the whole thing, the tank, the distribution box, and the drainfield, sized from your bedroom count and the soil under your lot. A three bedroom home in Spartanburg usually calls for a 1,000 gallon tank, while a four bedroom house steps up to 1,250 or 1,500 gallons.
Why Sizing and Soil Matter
- Bedroom count sets the tank. County sizing tables tie tank volume to bedrooms, so we confirm the number before ordering a concrete, polyethylene, or fiberglass unit.
- Perc rate sets the field. A percolation test tells us how fast water drains, which decides whether you get a gravity trench field, a chamber system, or an engineered mound.
- Separation keeps it legal. Code wants four feet between the field and the seasonal high water table or bedrock, and we design to hold it.
Our Process
We start with a site evaluation and perc test, lay out the tank and drainfield on paper, and pull the Spartanburg County health department permit. Once it clears, we excavate, set the tank level, plumb the distribution box and effluent filter, build the field, and backfill to a graded, seeded finish. Most conventional installs run two to four days, and we set the access risers at grade so future pumping is simple.
Call (864) 846-3858 for a free estimate on a new septic system in Spartanburg.
Need help in Spartanburg?
Call (864) 846-3858